Bottom track

Description i
Length Description Diagram number Code
4m Bottom track 6 99100 10

Interline Sliding Door

Interline sliding door assembly diagrams

Sistema-4 assembly diagram 1
Diagram 1.
Mark the center heights on the strip handle as per the measurement sheet.
Sistema-4 assembly diagram 2
Diagram 2.
Fit the glass or board pannels between the H-CHANNEL, add the strip handles over the pannels and secure it through the drilled holes with selfcutting screws.
Sistema-4 assembly diagram 3
Diagram 3.
With a wooden flat end wedge insert the gasket into the back side of the frame with the glass pannel.
Sistema-4 assembly diagram 4
Diagram 4.
The bottom rollers are positioned at the back of the door and fastend with self cutting screws.
Sistema-4 assembly diagram 5
Diagram 5.
The top guides are positioned at the back of the door and fastend with self cutting screws.
Sistema-4 assembly diagram 6
Diagram 6.
Fasten the top track at 300mm intervals with 2 screws at either end and the other screws alternating between both track sides. (Use the v-grooves as Drilling guides). Fasten fixing profile at 300mm intervals clip the bottom track over the fixing profile and secure by tapping on with rubber mallet.
Sistema-4 assembly diagram 7
Diagram 7.
Tilt door and insert into top track. Swing door over the bottom track and set it down so that the wheels lie in the slots, the door can now be adjusted by the setting screws at the back of the bottom roller.